Leasehold and managed-property projects

Before the works are committed, establish what the licence to alter process actually requires.

A landlord’s consent route can affect the design, professional team, contractor information, deposits and start date. Planning permission does not replace it.

Completely free. No card details required.No obligation. Immediate preliminary result.
Check my project readiness
See the licence pathway ↓

One specialist pathway

Licence to alter sits inside Start-Ready, not beside it.

The free check should identify whether a freeholder, landlord or managing-agent approval may affect the commitment. The £395 Decision Pack can then take the licence as the priority issue, interpret the assessment position and set out the immediate route. Where the actual licence or supporting project evidence needs professional review, use the £950 Resolution Plan.

A separate licence-to-alter resource is useful as a targeted entry point. A separate product would fragment the client record and understate the connected planning, technical, neighbour and contractor issues.

What the pathway examines

Five questions before the programme becomes an assumption.

01

The consent route

Who must approve the works, what the lease requires and whether the managing agent has issued a formal alterations process.

02

The submission package

Drawings, specifications, structural information, method statements, insurance and professional appointments required for review.

03

The connected consents

Planning, listed building, Building Control, Party Wall and access matters that remain separate from the licence.

04

The conditions and costs

Undertakings, deposits, professional fees, inspection rights, working-hour restrictions and reinstatement obligations.

05

The programme reality

What may be designed or tendered now, what cannot responsibly start, and which approval dependencies control the date.

Free diagnosis

Identify whether the licence route could affect the proposed commitment.

Self-reported position, useful questions and the normal professional owners.

£395 Decision Pack

Turn the licence uncertainty into a prioritised route.

A professional Decision Position, Priority Actions, 30-Day Action Sequence and Evidence Request List based principally on the completed assessment. Evidence verification belongs to the £950 Resolution Plan.

Read the scope and boundaries